Hospitality

The rules that made our quality possible has never changed a bit, nor our obedience by them…

Further to a deep involvement in the design of several hotel projects, SYDEN got accustomed with the nature of the responsibilities demanded in this fast-paced industry and developed the necessary skill set required to meet all commitments. This learning curve will be an important added value brought to any project in any future task assignment to SYDEN, namely fast track hotel projects.

SYDEN, specializes in the architecture and engineering design services with extensive expertise in hotel MEP brand standards and Fire and Life Safety systems. SYDEN has full capabilities to tailor the design based on the operator requirements to suit the project constraints and to bypass the many blocking points typically encountered in a PIP renovation project. SYDEN has been extensively involved in the design services of upscale hotels, luxury resorts and boutique hotel projects, with over 30 branded hotels commissions, from over 10 international hotel operators.

Based on an extensive experience in similar projects, we strongly believe that the success of the Project will be tightly related to the different parties’ adherence to a clear predefined chart of communication and cooperation links.

Reference Projects

The major projects that have marked the company portfolio, are as follows:

The Stage Mixed-use Project – Renaissance Hotel – Riyadh, KSA

The Marriott “Renaissance” is an upscale Luxury branded hotel. The project also includes a commercial cluster comprising of restaurants, high-end retail shops, and concept offices. The project’s vision was to establish a bustling commercial district conceived as a platform to attract pedestrian flow from the nearby streets and metro station.

Year: 2020 – 2021 

Client: Al Saedan Co. For Real Estates

Scope: Lead Design Consultancy covering Architecture and Engineering

New Built | Hotel 25,000 m2 | Commercial 18,000 m2 | 248 rooms

 

Marriott Courtyard Kuday – Makkah, KSA

The Courtyard by Marriott Kuday Hotel, situated in Makkah, boasts an impressive number of rooms, including several four-bed guestrooms. It’s home to three food and beverage outlets, each offering a generous number of seats. The built-up area has been effectively utilized to provide a significant amount of space for each room. The hotel was designed with cost efficiency in mind, maintaining an affordable cost per room.

Year: 2020 – 2021

Client: Ibrahim M. Bin Saedan Co.

Scope: Lead Design Consultancy covering Architecture and Engineering

New Built | 31,500 m2 | 438 rooms

Anas Bin Malek Mixed-Use Complex – Riyadh, KSA

Al Mashria Al Oula, a leading real estate company, is embarking on the development of a novel mixed-use project, “Anas Bin Malek”. Situated on plots #2308, 2309, 2310, 2313, 2314 & 2315 in the Narges region of Riyadh, this project covers a total plot area of 5,400m² [90m(L) x 60m(W)] located on Anas Bin Malek road. The project is planned to host a 4-star hotel and a dynamic commercial area.

Year: 2022 – 2023

Client: Al Mashria Al Oula

Scope: Lead Design Consultancy covering Architecture and Engineering

New Built | 12,852 m2 | 112 rooms

Conrad Riyadh, KSA

Situated in Riyadh, KSA, the Laysen Valley Hotel is a meticulously built core and shell structure, designed to accommodate the prestigious Conrad Hotel – an upscale luxury brand managed by Hilton. This exceptional project features a variety of amenities including a lavish lobby/lounge, an all-day dining facility, meeting rooms, boardrooms, a specialty restaurant, an executive lounge, an indoor pool, a spa, a gym, and all necessary back-of-house facilities and technical areas

Year: 2022 – 2023

Client: Mashreq

Scope: Lead Design Consultancy covering Architecture and Engineering

New Built | 29,000 m2 | 171 rooms

Embassy Suites By Hilton – Jeddah, KSA

The hotel building is ideally located on Sari Street in Jeddah, occupying a prime piece of land with a substantial built-up area. The project features a host of exquisitely designed rooms, with a majority being suites and the remainder as studios. These rooms are distributed across several floors that include guestrooms, basements, a ground floor, podiums, an all-day dining area, a technical floor, a recreational floor, a floor dedicated to a swimming pool and gym, as well as all necessary back-of-house facilities and technical areas.

Year: 2019 – 2021

Client: AlDiyafa AlAsria Company Ltd.

Scope: Lead Design Consultancy covering Architecture and Engineering

New Built | 32,250 m2 | 60% suites / 40% studios

Earth Hotel Marjan Island – Ras Al Khaimah, UAE

The Earth Hotel Marjan Island, set to accommodate a 4-star hotel, exemplifies state-of-the-art modular design. The project features a concrete structure from the foundation up to the first-floor slab. Meanwhile, the guestroom floors from the first to the eighth will be of modular construction, facilitated by FortaPro. This unique design feature is being introduced for the first time in the region, marking a significant innovation for a project of this scale.

Year: 2022 – 2023

Client: Earth Hotels

Scope: Lead Design Consultancy covering Architecture and Engineering

New Built | 30,000 m2 | 265 rooms

Marriott Hotel & Marriott Executive Apartments – Kampala, Uganda

The project, located in Kampala, Uganda, comprises two towers resting atop a podium, complete with multiple basements, a ground floor, and a mezzanine. These towers, interconnected by a bridge at a high level, together provide a plush experience. The West Tower, known as “Marriott Executive Apartments,” includes a multitude of rooms, a penthouse, sky bar, terrace, and hot kitchen. The East Tower functions as “Marriott Hotel,” offering a substantial number of rooms. The podium is home to a range of amenities including a casino, function spaces, meeting rooms, ballrooms, outdoor recreational areas, pools, lobbies, lounges, an all-day dining facility, destination bar, outdoor event areas, etc., as well as all essential back-of-house facilities and technical areas.

Year: 2018 – 2021

Client: Capital Shoppers Ltd., Uganda

Scope: Lead Design Consultancy covering Architecture and Engineering

New Built | 56,700 m2 | 276 rooms

DoubleTree by Hilton | Abha Al-Mourouj, KSA

Al Mourouj Hotel, nestled in Abha, KSA, is set to undergo a transformation into a luxurious DoubleTree by Hilton Hotel. Spread across multiple levels including the basement, ground floor, several upper floors, and roof. This accommodation will feature numerous rooms, a grand lobby, a fitness center coupled with a swimming pool, a restaurant and coffee shop operated by a third-party, an all-day dining area, and functional spaces for meetings. Additionally, it includes all the necessary back-of-house facilities and technical areas.

Year: 2019 – 2020

Client: Mazaya International Ltd., KSA

Scope: Lead Design Consultancy covering Architecture and Engineering

New Built | 16,400 m2 | 150 rooms

DoubleTree by Hilton | Abha Al-Mahala, KSA

Al Mahala, an elegant addition to the DoubleTree by Hilton hotel collection in Abha, KSA, a stunning new-build hotel. This spacious hotel, with a substantial built-up area spanning a basement, ground floor, mezzanine, multiple upper floors, and a roof, offers a myriad of features. These include a significant number of rooms, a grand lobby, a generous ballroom, a restaurant catering for three meals a day, function spaces and meeting rooms, a rooftop café, and leisure facilities such as a gym and pool. It also provides all necessary back-of-house facilities and technical areas.

Year: 2019 – 2020

Client: Mazaya International Ltd., KSA

Scope: Lead Design Consultancy covering Architecture and Engineering

New Built | 26,400 m2 | 198 rooms

DoubleTree by Hilton Jeddah Al-Salamah, KSA

The DoubleTree by Hilton Al-Salamah, situated in Jeddah, is an upcoming hotel featuring a considerable number of rooms. The project is currently under construction and concurrently undergoing a redesign process to ensure it meets the standards of the renowned hotel chain .

Year: 2017 – 2019

Client: Fahd Abdellah Al Harbi & Sons, KSA

Scope: Lead Design Consultancy covering Architecture and Engineering

Re-Design | 112 rooms

Earth Hotel – Jeddah, KSA

Earth Hotel Jeddah exemplifies state-of-the-art modular design, comprising prefabricated modules meticulously assembled on-site to form a striking and efficient structure. This approach to modular construction not only accelerates building timelines but also minimizes waste and enhances quality control. Consequently, the result is an eco-conscious hotel that marks a distinctive and exhilarating advancement in the hospitality sector.

Year: 2023

Client: Earth Hotels

Scope: Architectural Concept Design

New Built | 14,000 m2 | 130 rooms

Regent Hotel | KAFD Parcel 5.06

Year: 2021 – ongoing

Location: Riyadh, KSA

Client: Saudi Arabian Baytur, KSA | KAFD, KSA

Scope: Contractor’s Consultant | Architecture, MEP and F&LS

Kimpton Hotel | KAFD Parcel 4.05

Year: 2021 – ongoing

Location: Riyadh, KSA

Client: Saudi Arabian Baytur, KSA | KAFD, KSA

Scope: Contractor’s Consultant | Architecture, MEP and F&LS

Residence Inn by Marriott Dammam

Year: 2019 – 2021

Location: Dammam, KSA

Client: Faisal Al Ansari Limited Co., KSA

Scope: Re-Design & Construction Follow-up | MEP, ICT / AV, eSecurity and F&LS

The Fairfield by Marriott Makkah Al-Naseem

Year: 2021 – ongoing

Location: Makkah, KSA

Client: Emad Abdulrehman Ali Hejazi Establishment, KSA

Scope: Design | MEP, ICT, AV, and eSecurity

Voco by IHG Al-Khobar

Year: 2019

Location: Al Khobar, KSA

Client: Rajhi Invest, KSA

Scope: Design (PIP Renovation) | MEP, ICT / AV, eSecurity and F&LS

Holiday Inn

Year: 2019

Location: Al Khobar, KSA

Client: Rajhi Invest, KSA

Scope: Design (PIP Renovation) | MEP, ICT / AV, eSecurity and F&LS

Voco by IHG The Palm

Year: 2021 – ongoing

Location: Dubai, UAE

Client: Al Salehi Contracting Co.

Scope: Inspection and Handing over | MEP, ICT / AV, eSecurity and F&LS

Le Meridien Riyadh

Year: 2019

Location: Riyadh, KSA

Client: Aljazeera Alola for Real Estate Development, KSA

Scope: Inspection and Handing over | MEP

Four Points by Sheraton DDSC

Year: 2020 – 2021

Location: Dakar, Senegal

Client: SPORTS CITY DIAMNIADO (SCD Co.), Senegal

Scope: Design | ICT / AV, eSecurity and F&LS

Hyatt Place Addis Ababa

Year: 2021

Location: Addis Ababa, Ethiopia

Client: Leyat Hotels Plc., Ethiopia

Scope: Design | Fire And Life Safety

Hampton by Hilton

Year: 2016 – 2017

Location: Makkah, KSA

Client: NOMW Capital, KSA

Scope: Design | MEP, ICT / AV and eSecurity

Park Inn Jeddah

Year: 2016

Location: Jeddah, KSA

Client: Ghina Real Estate Co., KSA

Scope: Concept Design | Architecture, Structure, MEP and FLS

Marriott Courtyard Jeddah

Year: 2017

Location: Jeddah, KSA

Client: Rafael De La Hoz, Spain

Scope: Design | Fire & Life Safety

Marriott Courtyard Yanbu

Year: 2017

Location: Yanbu, KSA

Client: Rafael De La Hoz, Spain

Scope: Design | Fire & Life Safety

Sheraton and Westin hotels | JODP Zones S3 & S4

Year: 2014 – 2016

Location: Makkah, KSA

Client: Saudi Arabian Baytur Construction Co. | Jabal Omar Development Co. (JODC), KSA

Scope: Contractor’s Consultant | MEP, ICT / AV and eSecurity

JW Marriott, Marriott Courtyard, Hyatt Place, Hyatt House | JODP Zones N6b & N6c

Year: 2013 – 2015

Location: Makkah, KSA

Client: Jabal Omar Development Co. (JODC), KSA

Scope: Lead Design Consultancy covering Architecture and Engineering

Crowne Plaza, Holiday Inn, Radisson Blu and Four Points by Sheraton | JODP zone N5

Year: 2012- 2014

Location: Makkah, KSA

Client: Jabal Omar Development Co. (JODC), KSA

Scope: Lead Design Consultancy covering Architecture and Engineering

Marriott and Hilton Convention | JODP Zones N2 & N3

Year: 2011- 2013

Location: Makkah, KSA

Client: Nesma & Partners Contracting Co. | Jabal Omar Development Co. (JODC)

Scope: Contractor’s Consultant | Engineering services covering Architecture, Structure, MEP and F&LS